Old Timberline Trail
WA
At a Glance
About This Trail
The trail starts at Nannup Foreshore Park, crossing the old railway bridge across Blackwood River. Across the bridge, the trail diverges from the Munda Biddi Trail and Sidings Rail Trail as it heads west through jarrah forest. The forest becomes increasingly lush as the trail approaches Workmans Pool then continues along St Johns Brook to a picnic spot at Barrabup Pool. Across the brook the trail follows a longer stretch of rail form before descending steep and gravelly sections of singletrack toward the Sleeper Hewers Hut campsite, then remains on rail form to the trail’s end at Cambray Siding. Trail users can return to Nannup by retracing their steps or returning via Sidings Rail Trail. Start of the trail where it branches off the Sidings Rail Trail at Cambray Sidings (Garry Long 2018)
Links & Resources
Find Nearby Accommodation
Hotels, apartments, hostels and luxury stays
We may earn a commission from bookings made through these links, at no extra cost to you.
Nearby
Campsites(5)
Trails(3)
Toilets(3)
Fuel(2)
Dump Points(1)
Lions Timber Park
Free · 0.8km